Results of the week in the project "Duyunov's motors"
The construction of the "Sovelmash" design and engineering technology department proceeded routinely over the last week. Inside the building, the construction workers handled separate rooms, electrical wiring and other tasks. Outside, the installation of engineering networks was underway.
The new challenge of springtime is the intense melting of snow on the roof. The team has prepared for this in advance. The melt water is being timely drained into a well on the site, and is then pumped from there onto the terrain and into the storm drainage system of the SEZ "Technopolis "Moscow".
A report about opening the SOLARGROUP office in Côte d'Ivoire was broadcast on Business 24 TV channel. You can watch it in French by following this link.
The journalists interviewed the top managers of SOLARGROUP and the company's national and leading partners in Côte d'Ivoire. Cooperation with local television is becoming regular, which contributes to promoting the project.
An opportunity to buy a share of "Sovelmash" for a child has been introduced in the back office. To do this, you need to purchase a special child package. These are investment packages of the same denominations and discounts as the standard ones. The only difference is that they are not registered in your name, but in the name of your children. When your child reaches the age of majority, he or she gets verified in the back office, and the investment shares become their property. You can find more details in the back office by clicking here.
Follow our news and keep abreast of the project development!