Last week, the utilities were installed, landscaping and interior finishing were carried out at the construction site.

• Drilling was completed and a pipe was placed under the roadway to connect the storm drainage system.
• A trench was dug for the cold water pipes.
• The installation of utilities at the entrance to the site was completed.
• The ethylene glycol line for climate control systems was made.
• The workers started laying the black soil to the left and rear of the building.
• The kerbstone was installed in accordance with the design marks to the left of the building.
• The reinforcement work at the main entrance was completed.
• The installation of the heat distribution station was underway.
• Heating pipes, water supply and other utilities inside the building were installed.
• Low-current engineering networks were installed.
• Partitions and doors were installed and the ceiling in the control room was painted.
• Part of the frames for the glass enclosures were assembled.
• Preparations for installing the floor tiles were underway in the entrance area of the O&A building.

On October 1, SOLARGROUP launched a prizes-for-all lottery to facilitate the completion of the project funding.

Lottery prizes:

• Changan Yidong EV 460 electric car,
• Denzel Liberty electric motorcycles with a "Slavyanka" based motor,
• bonus investment shares.

For every $ 100 in payments, you will get $ 10 cashback to your main account and a coupon to participate in the prize raffle.

Besides, there is a +10% bonus for early repayment of installment plans as well as an opportunity to restore your installment plan on preferential terms available in the course of the lottery.

Find out more by following the link.

Participate to win valuable prizes and support the "Sovelmash" D&E construction!

INVEST