Upon the latest submission of documents for the commissioning permit, the permit was denied again—however, this time the list of requirements was significantly reduced. Sovelmash is preparing the next submission.

Work was carried out to develop technologies for mass production of housed electric motors. The first stator was press-fitted into the standard 90-millimeter-long housing using tooling designed and manufactured at Sovelmash.

Work commenced on tumbling the cast parts for built-in motors to improve their appearance.

Profiles for the heatsinks of the power controller, which will be installed in the motor of the "Motylek" drone, have arrived. They were manufactured to order for Sovelmash.

In the laboratory, the delivered aluminum alloy was inspected, found to be of poor quality, and corrected: impurities were removed, it was degassed, and additives were introduced.

Current promotions

Final sale of zero-stage shares in the "New Generation Airships" project — through April 12 inclusive.

Cashback up to 20% for the first account top-ups made with cryptocurrency — through April 26 inclusive.

Last opportunity to reinstate installment plans in the "Duyunov Motors" project — through April 30 inclusive.

*The translation is done with the help of artificial intelligence.

To other promotions