"Sovelmash" construction site today

"Sovelmash" construction site today

The work inside and outside the "Sovelmash" design and engineering technology department is in full swing. The clear sky weather in Moscow and your investments contribute to this!

• Electricity is being wired, tiling is being done, interior walls are being finished, and ceiling elements are being painted in the D&E premises. All the coatings are fire resistant and are applied in accordance with the necessary requirements.
• The ventilation system, pipework, fire sprinkler system and more are being installed.
• Installation of the heat distribution unit is in progress.
• A pit is being formed outside the building through which the storm sewer connection will be drilled.
• Backfilling of the heating pipeline is in progress.
• Work is underway next to the platform for the air conditioning systems, which will soon be installed in their place.
• The temporary fence has been completely dismantled and a permanent one will soon be installed in its place.

Watch the video with Alexander Sudarev to find out more.