"Sovelmash" D&E: cladding and concrete bedding are virtually completed

"Sovelmash" D&E: cladding and concrete bedding are virtually completed

In the new video from the construction site where the "Sovelmash" design and engineering technology department is built, Alexander Sudarev will tell what tasks are being performed now and what is to be implemented.

The main task is to prepare the D&E for the winter season. As part of this task it is necessary to perform a large amount of work, namely to close the thermal envelope of the building, install the equipment, connect the engineering utilities, provide heat supply to the building. And today, work is still in progress at the construction site in these regards. 

Casting the concrete bedding continues in the testing and production part of the building, the fireproofing on the 2nd floor mezzanine has been performed, installation of the frame for the future interior partitions has started, the interior partitions are up on them and the builders will start assembling the walls in the near future.

The metal frame is being loaded. Loading of the necessary construction materials is carried out through the technological opening envisaged in the project, which will subsequently acquire the shape of a gate and continue to perform the same functions for loading of oversized equipment and necessary materials after closing the thermal envelope and commissioning the building. 

The installation of the enclosing structures around the elevator shafts is in progress, preparations are underway to start lining the shafts themselves. In the testing and production areas of the building, all the window frames have been installed. 

Work continues on the stairwells, where the installation of window frames is being completed.
Most of the glazing in the O&A building has been installed, the overhanging bay window has been fully covered with panoramic glazing, and all the window frames have been installed in it. 

The roofing work over the O&A building is being completed, the insulation has been installed and all the technological openings are being sealed and closed. 

Currently, work at "Sovelmash" is well underway on all fronts. The builders, engineers, and many others are working to implement the main objective of the project - the D&E construction. 

But the rate of construction is directly related to the rate of funding, and now each of you has the opportunity to influence the pace of work on the construction site.

You can do that by purchasing an investment package in the back office or by supporting the project gratis here.