Find out what is happening at the construction site today in the new video.

The earthwork is in progress at the site: the heating networks are being handled and the landscaping is underway.

The rear of the building is being cleaned and redesigned: the wells, rings and waste storage container will be relocated.

The high-voltage power supply to the building is being prepared. A unit has been built to dispose of water through the storm drainage system.

The grounding has been installed to facilitate smooth operation of the "Sovelmash" laboratory and ensure high-precision measurements in accordance with all relevant requirements.

The ramp unit has been fitted with geotextile, backfilled with sand, the ground is being compacted, a trench has been dug to connect external lighting, and the fence is about to be dismantled and removed.

New building materials have been delivered to the site.

The scope of work currently underway is quite extensive and requires everyone's attention for successful implementation of the project!