"Sovelmash" D&E construction

• The "Sovelmash" design and engineering technology department was assigned a cadastral number and the real estate ownership was registered with the Federal Service for State Registration, Cadastre and Cartography (Rosreestr). This is a milestone event, which will make it possible to put the premises on the balance sheet of "Sovelmash" and make a valuation of the company's assets in the future. Also, the obtained documents make it possible to enter into contracts for the supply of electricity, water and heating to the D&E on a permanent basis, which significantly saves the company's expenses.

• The State Technical Oversight Authority (Gostekhnadzor) inspected the heat distribution unit of the "Sovelmash" D&E, and no comments related to any faults were made as a result of the inspection. After receiving the inspection report, it will be possible to enter into a heat supply contract. This is an important step on the way to obtaining the certificate of construction completion and putting the "Sovelmash" D&E into operation.

• The main scope of finishing work on the third floor of the production part was completed. The cleanup of the premises was well underway.

• The SMD assembly line was installed and the first boards for the angle grinder controller were made on it.

• A lawn irrigation system was installed on the premises.

• The most difficult part of the work on tapping the second water supply inlet was completed.

• New equipment was delivered to the D&E, namely three stationary compressors.


SOLARGROUP news

The opportunity to fill out an application form for acquiring the company's shares became available for investors from Vietnam and North Macedonia. Earlier access was granted to Russia and India.


Current offers

5% discount on payments of $ 100 or more for early repayment up to and including August 31.

Friendly promo code for 10% of bonus shares when buying a new package until the end of stage 19.

Information about all the offers in the project is available in the back office.

Use and invest in the "Sovelmash" engineering business with maximum benefit!

Invest