The week results in Duyunov's project

The week results in Duyunov's project

Now all the project efforts are directed at starting the construction of the future design engineering department as soon as possible. But the laboratory is buzzing with activity too.

1) Another set of motors arrived from the winding specialists for further testing. We have already conducted comparative testing, the protocols are being documented. The bases of protocols are growing, the methods are being fine-tuned.
2) The work on expert review of the specifications, programmes and methods is underway. This work is serious and significant, since it's the documentary basis of the future enterprise.
3) A small batch of controllers is 95% equipped. Checking the assembly technology and gathering the comments is on the plan.
The controller plates are now being surface-mounted, next week other structural components will be ready too.